Close tracker items delivered by merged pull requests (2026-10-16)

Merged
UN
7d ago
+31-7

pm github closeout --repo unbraind/pm-github --pr 130 --pr 131 --pr 132 --apply verified that every required head check of the three merged pull requests concluded success (CodeQL, CodeRabbit, codeql, semgrep, test (22), test (26); #131 also Sourcery) and closed the items they deliver:

ItemDelivered by
pm-github-z5z1 — Let reusable sync choose its npm project directory#130
pm-github-q4uz — Refuse reusable sync runs outside the caller default branch#131
pm-github-0x3y — Add a reusable gated closeout PR workflow#132

pm-github-0x3y was tagged added so pm-changelog files it under Added (its type is Task). CHANGELOG.md was regenerated with npm run changelog:full, and changelog:check passes. pm health --strict-exit is ok in a clean HOME. This lands before the 2026.10.16 daily release so the release notes include all three changes.

Summary by Sourcery

Close out the tracker items delivered by the merged pull requests and publish their changes in the unreleased changelog.

New Features:

  • Record the reusable gated closeout PR workflow as delivered.
  • Record the reusable sync npm project directory selection as delivered.

Bug Fixes:

  • Record the safeguard preventing reusable sync runs outside the caller's default branch.

Documentation:

  • Regenerate the changelog to include the delivered workflow, sync directory selection, and branch validation changes.

Chores:

  • Update tracker histories and statuses for the changes delivered by the merged pull requests.

Summary by cubic

Closes the tracker items delivered by merged pull requests #130, #131, and #132 from the 2026-10-16 closeout, and regenerates the changelog so the next daily release notes include the three delivered changes.