ci: control run of the Windows daemon lifecycle jobs (do not merge)

Draft
BO
2d ago
+2-0

Draft control run. It changes only a comment in the workflow file, so the Windows lifecycle jobs run on the current base (25fad639) with no code change. Used to tell whether the intermittent Windows daemon test failures also happen without PR #519. Will be closed after two runs; do not merge.


Summary by cubic

Adds a comment to the Windows daemon lifecycle workflow so the jobs run on the current base without any code change, checking whether the intermittent Windows daemon test failures also happen without PR #519. This is a control run and should not be merged.