docs(v3.2): signed candidate roadmap with G53/G55 live reconciliation

Merged
TH
8d ago
+1762-0

V3.2 — Signed architecture planning candidate, NOT execution authority

This is a fresh signed+DCO, current-main replacement for the
historical unsigned/no-DCO PR #187. It restores the substantive
V3.2 architectural source audit, gap ledger, planned full review
journey, identity/algebra, D1 comparator qualification, product/UX,
research corpus and phase roadmap as planning only, together
with a dated authoritative reconciliation of the changed live
frontier. Canonical V2 remains the only execution authority.

Controlled scope

  • Ten proposed V3.2 audit/plan/research documents copied as
    source proposals, one 2026-10-10 current-frontier reconciliation,
    and an append-only pointer in docs/COMMAND_F_PLAN_INDEX.md.
    Precisely 12 changed documentation/research paths.
  • No source code, Cargo manifests/lock, workflows, donors, AF-02
    verifier/frozen authority, active GitHub rulesets or release
    implementation modified. No root redistribution license,
    certification or security PASS claims.
  • The original 2026-10-08 snapshot is preserved as dated
    historical evidence, not falsely presented as live GitHub state.

Reconciliation against actual 2026-10-10 main

  • Live G53 is already the founder-adopted zero-human-approval
    GitHub governance policy (PR #223). Old proposed V3.2 G53
    explanation/accessibility work is renamed proposed G55,
    eliminating an actual numbering/authority collision.
  • Normal guarded PR merge, signed+DCO and exact-head rust,
    assurance-proof, scorecard still apply. No mandatory human
    or Code Owner approval remains. Optional OCR/Jev/reviews are
    NOT_RUN unless truly executed.
  • G51 five-file planning Spec Kit merged signed in PR #225.
    Its bootstrap verifier/FD-1 exception and separate FD-2
    ruleset adoption are NOT approved or implemented.
  • Partial review-preview CLI (PR #211) and user README (PR #224)
    are now implemented. Full multi-consumer review, atomic
    receipts, Studio, version coverage and stable release are NOT.
  • Current investigations #100, #215, #214, #221, and #15
    remain open: no fabricated source-digest equivalence or
    review of unavailable provider evidence.

Qualification and historical replacement

  • Exact candidate head 13244a0b4c86f96d6ea17c54f936a282c139ad8a:
    GitHub verified signed commit, DCO true, and only the 12
    bounded documents modified.
  • Checked Markdown heading/code-fence balance and G53/G55
    distinction; git diff --check PASS.
  • Await all exact-head technical CI and post-merge assurance.
    The optional Cubic review service may return NEUTRAL due
    quota; that is NOT_RUN, not review PASS, and not a Rust gate.
  • Original unsigned PR #187 must not be merged or rewritten.
    This is a new commit, not a rebase or force push.
  • Merging this PR must not activate a V3.2 implementation
    phase or grant any founder decision. Any actual migration
    requires its own specific proposal, review of current rules,
    explicit authorization and separate exact-head technical CI.

Summary by cubic

Restores the V3.2 architectural audit and master-plan as a signed, planning-only candidate with a dated reconciliation of the changed live frontier. Canonical V2 remains the only execution authority; merging this PR authorizes no implementation or founder decision.

  • Adds ten proposed audit/plan/research documents, one 2026-10-10 frontier reconciliation, and an append-only index pointer — 12 documentation paths, no code or workflow changes.
  • Preserves the 2026-10-08 snapshot as dated historical evidence, not current GitHub state.
  • Keeps the gap ledger, identity/algebra, D1 comparator qualification, product/UX, research corpus, and phase roadmap as proposals only.
  • Supersedes the unsigned historical PR #187 without rewriting history.

Reconciliation with live main

  • Live G53 is already the founder-adopted zero-human-approval governance policy (PR #223); the old proposed G53 work is renamed proposed G55 to avoid the numbering/authority collision.
  • G51 planning Spec Kit, README, and review-preview are recorded as merged; bootstrap verifier (FD-1/FD-2), protected AF-02 changes, full multi-consumer review, and stable release remain unqualified and unapproved.