Rules audit: record the 8-9 Nov rulings, consolidate rules, tidy docs
Merged
BI
3d ago+2411+2411+0123456789012345678901234567890123456789-1895-1895-0123456789012345678901234567890123456789
Requested by Josh · project thread
What this does
Josh approved every recommendation of the 9 Nov 2026 rules audit ("Yes to all recommendations"). This is the documentation half. The clinical value changes are in a separate held PR.
- Decision log: new entries D-99 to D-107: Real details (25 Sept), under a form, clinically ready since, screenshot blur and name-free exports (replaces the downloads part of D-83), override review, care plans and flags, clerk details (partly replaces R-2026-09-04-A), the clinical values audit and the working-rules audit. Adds a status table at the top, two-way "replaced by" notes, rewords D-96 to "pulled", and marks D-28 and D-30 to D-35 "source unverified".
- Agent rules: history download pre-approved; fewest PRs (a held clinical PR is the only split); no merge queue in use; the design-review prompt is copied into
docs/design/and made the design rule (replaces D-91's viewer rule); Supermemory namespaces; definition of done refreshed; duplicate rules now have one home each; a "where things live" map in DOCS-SYSTEM. - Status pages: STATUS, roadmap, plans index and coordinator guide fixed (the legal-time warnings were the wrong way round); stale decision citations fixed; one backlog page at
docs/ward-flow/backlog.md. - Archive: superpowers, September plans, frozen mock-up status pages and the PsychSift design system moved to
docs/history/. Nothing deleted. - Code comments only: bare D-numbers from the old archive numbering now read "archive D-n". Journey review digests are refreshed for those comment-only edits.
Checks
npm run verify:pr-local: passed. That covered format, diff integrity, docs scripts, links, index and inventory, lock parity, backend typecheck, lint, typecheck and related tests (107 files, 1347 tests).docs/ward-flow/journey/verify.mjs --check,owner-rulings-index --checkanddocs:facts: passed.- Left to hosted CI: the full unit suite, backend integration, build and browser journeys.
Merge order: slot 4 of 12, per the merge-order thread.
Generated by Claude Code